Loading Guide

Preparing HPzenAi content

Skip to main content

Scenes

Emergency Stop

Configure Emergency Stop in HPzenAi Smart. Immediately stops controlled equipment and closes controlled water paths.

What it does

Everything off and closed, immediately.

Immediately stops controlled equipment and closes controlled water paths. Use this scene when the selected field devices should work together without repeated manual setup.

CategoryScenes
Works with
Motor ControllersValvesRelay Controllers

Automation Logic

When

Trigger

A user taps Run during an urgent condition.

Default

When I run it from the app

Choices
When I run it from the app

Example: tap Run on the saved card when you want this action to happen.

If

Condition

The target devices are reachable and can accept stop or close commands.

Default

No condition

Choices
No condition

Example: leave No condition selected when the trigger alone should run the workflow.

Then

Action

Turn selected outputs off and close selected valves immediately.

Default

Stop everything, close all valves, send confirmation

Choices
Stop everything, close all valves, send confirmationStop everything and close all valves

Example: choose "Stop everything, close all valves, send confirmation" for the default then behavior.

Active

Allowed Time

Manual scene. Keep visible for users who may need fast shutdown.

Default

All day

Choices
All dayDay (6 AM - 6 PM)Night (6 PM - 6 AM)

Example: keep All day for protection workflows, or choose Day or Night when operation should stay inside site hours.

Automation Details

Recommended use

Emergency shutdown, leak response, service work, and unsafe field conditions.

Device Inputs

Motor Controllers, Valves, Relay Controllers

Output Behavior

Turn selected outputs off and close selected valves immediately.

Safety Note

Make sure users know which devices this scene controls before relying on it.

Test Method

Run only during safe commissioning and confirm all selected equipment stops.

Visual reference coming soon
Future screenshot area for the Emergency Stop setup screen and saved Smart card.
Emergency Stop Walkthrough
Walkthrough video coming soon

Before You Start

Device Readiness

Link every device used by this workflow and confirm each one is online.

Device Selection

Choose the exact tank, pump, valve, relay, or meter that should be controlled.

Safe Test

Test with safe thresholds or manual observation before leaving the workflow enabled.

Guided Setup

Set Up Emergency Stop

Step 1 / 11
9:41
1

Open the HPzenAi app.

Step 1 / 11

Commissioning Checks

  • Confirm the scene only runs when a user taps Run.
  • Run only during safe commissioning and confirm all selected equipment stops.
  • Confirm the saved card shows the correct workflow, devices, schedule, and enabled state.
  • Review the event history after testing so the action is recorded as expected.
  • Keep safety-critical workflows active all day unless the site needs a specific time window.

Troubleshooting

  • If the Save button is disabled, complete every required trigger, condition, action, and timing field.
  • If the workflow does not run, confirm the devices are online and the active time allows it to run now.
  • If the action does not complete, check whether the target device is already in that state or cannot accept commands.
  • If notification behavior is missing, confirm phone notification permission and recent device data.