Configure Refill Band Control in HPzenAi Smart. Uses separate start and stop points to reduce pump toggling.

What it does

Start low, stop high, and avoid frequent pump toggles.

Uses separate start and stop points to reduce pump toggling. Use this automation when the selected field devices should work together without repeated manual setup.

CategoryTank & Pump
Works with
Level SensorsMotor ControllersGateways

Automation Logic

When

Trigger

Tank level crosses the lower refill point.

Default

Tank level drops below 35%

Choices
Tank level drops below25%35%45%Enter value

Example: choose "Tank level drops below" and keep the default 35%, select another preset, or enter another value.

If

Condition

The tank has not yet reached the upper stop point and the source is available.

Default

Pump has been idle for at least 10 min

Choices
Pump has been idle for at least5 min10 min15 minEnter valueNo condition

Example: choose "Pump has been idle for at least" and keep the default 10 min, select another preset, or enter another value.

Then

Action

Run filling until the upper stop point is reached.

Default

Run the pump until level reaches 85%

Choices
Run the pump until level reaches75%85%95%Enter valueOnly notify me

Example: choose "Run the pump until level reaches" and keep the default 85%, select another preset, or enter another value.

Active

Allowed Time

Use All day for stable tank control, or Day for planned filling windows.

Default

All day

Choices
All dayDay (6 AM - 6 PM)Night (6 PM - 6 AM)

Example: keep All day for protection workflows, or choose Day or Night when operation should stay inside site hours.

Automation Details

Recommended use

Tanks where frequent starts and stops shorten pump life.

Device Inputs

Level Sensors, Motor Controllers, Gateways

Output Behavior

Run filling until the upper stop point is reached.

Safety Note

Keep a wide enough band between start and stop levels to avoid rapid cycling.

Test Method

Verify the pump starts only at the low point and stays on until the high point.

Visual reference coming soon
Future screenshot area for the Refill Band Control setup screen and saved Smart card.
Refill Band Control Walkthrough
Walkthrough video coming soon

Before You Start

Device Readiness

Link every device used by this workflow and confirm each one is online.

Device Selection

Choose the exact tank, pump, valve, relay, or meter that should be controlled.

Safe Test

Test with safe thresholds or manual observation before leaving the workflow enabled.

Guided Setup

Set Up Refill Band Control

Step 1 / 12
9:41
1

Open the HPzenAi app.

Step 1 / 12

Commissioning Checks

  • Confirm the pump starts and stops at the expected tank levels.
  • Verify the pump starts only at the low point and stays on until the high point.
  • Confirm the saved card shows the correct workflow, devices, schedule, and enabled state.
  • Review the event history after testing so the action is recorded as expected.
  • Keep safety-critical workflows active all day unless the site needs a specific time window.

Troubleshooting

  • If the Save button is disabled, complete every required trigger, condition, action, and timing field.
  • If the workflow does not run, confirm the devices are online and the active time allows it to run now.
  • If the action does not complete, check whether the target device is already in that state or cannot accept commands.
  • If notification behavior is missing, confirm phone notification permission and recent device data.