How to mount and wire the SP-3P complete three-phase smart motor starter into a motor control panel.

Section: Starter 3-Phase

Safety Requirements

The SP-3P handles live 415V AC three-phase mains on its input terminals. All mains wiring must be performed with the supply isolated, locked off, and proved dead at all three phases before any work begins.

Steps

  • Isolate the incoming three-phase supply at the main switch-disconnector or MCB feeding the panel. Apply a lock-out tag-out.
  • Prove dead at R, S, T terminals using a calibrated voltage tester — test R-S, S-T, and R-T before touching any wiring.
  • 415V AC three-phase wiring must be performed by a qualified electrician.
  • 12V DC control supply and RS485 wiring to the built-in MX-3P module may be handled by a competent technician once the mains is isolated.
  • Never apply mains voltage to the 12V DC or RS485 terminals on the MX-3P module.

Tools Required

Visual reference coming soon
Visual reference for the tools needed before starting this guide.

Tool Checklist

PreviewQuantityItemDetails
× 1Flat-Head Screwdriver (6 mm)For R, S, T input and U, V, W output mains terminal screws on the SP-3P assembly
× 1Flat-Head Screwdriver (3 mm)For MX-3P RS485 and 12V DC control terminal screws
× 1Wire StrippersFor preparing 4 mm² mains cable ends and 1.0 mm² control cable
× 1Calibrated Voltage TesterTo prove dead at all three phases before work and confirm voltage after power-up
As required4 mm² Three-Core CableFor R, S, T supply input and U, V, W motor output connections (size to motor current)
× 1Clamp MeterTo measure motor running current on each phase during commissioning
As requiredRS485 Shielded Twisted-Pair1.0 mm² shielded cable from MX-3P RS485 terminals to gateway
Item 1× 1

Flat-Head Screwdriver (6 mm)

For R, S, T input and U, V, W output mains terminal screws on the SP-3P assembly

Item 2× 1

Flat-Head Screwdriver (3 mm)

For MX-3P RS485 and 12V DC control terminal screws

Item 3× 1

Wire Strippers

For preparing 4 mm² mains cable ends and 1.0 mm² control cable

Item 4× 1

Calibrated Voltage Tester

To prove dead at all three phases before work and confirm voltage after power-up

Item 5As required

4 mm² Three-Core Cable

For R, S, T supply input and U, V, W motor output connections (size to motor current)

Item 6× 1

Clamp Meter

To measure motor running current on each phase during commissioning

Item 7As required

RS485 Shielded Twisted-Pair

1.0 mm² shielded cable from MX-3P RS485 terminals to gateway

What's in the Box

Visual reference coming soon
Visual reference for the items included in the package.

Included Items

PreviewQuantityItemDetails
× 1SP-3P Starter AssemblyPre-assembled three-phase contactor + overload relay + MX-3P module
× 1RS485 Terminal Block2-position screw terminal for RS485 A and B wiring
× 112V DC Input Terminal2-position terminal for 12V DC control power supply connection
× 1Phase Sense Terminal Block3-position terminal for R, S, T phase sense wires (tapped from mains input)
× 1DIN Rail Mounting ClipSpring clip for 35 mm DIN rail — for SP-3P-9 and SP-3P-18 models
× 1Panel Mounting BracketDirect panel mount bracket for SP-3P-32 model (larger contactor, back-plate mount)
× 1Quick Installation CardPrinted terminal wiring diagram for R/S/T input, U/V/W output, RS485, and 12V DC
Item 1× 1

SP-3P Starter Assembly

Pre-assembled three-phase contactor + overload relay + MX-3P module

Item 2× 1

RS485 Terminal Block

2-position screw terminal for RS485 A and B wiring

Item 3× 1

12V DC Input Terminal

2-position terminal for 12V DC control power supply connection

Item 4× 1

Phase Sense Terminal Block

3-position terminal for R, S, T phase sense wires (tapped from mains input)

Item 5× 1

DIN Rail Mounting Clip

Spring clip for 35 mm DIN rail — for SP-3P-9 and SP-3P-18 models

Item 6× 1

Panel Mounting Bracket

Direct panel mount bracket for SP-3P-32 model (larger contactor, back-plate mount)

Item 7× 1

Quick Installation Card

Printed terminal wiring diagram for R/S/T input, U/V/W output, RS485, and 12V DC

Removing an Old Starter

When upgrading an existing three-phase DOL starter, the SP-3P replaces the complete starter assembly. The previous contactor, overload relay, and control accessories should be removed from service instead of remaining electrically connected.

Steps

  • Remove or isolate the previous DOL contactor, overload relay, timer relay, and manual control circuit before energising the SP-3P.
  • Reuse only healthy incoming and outgoing power cables that match the motor current rating and local installation standards.
  • Do not leave any old auxiliary coil wiring connected to the motor control path after the SP-3P is installed.
  • If the existing panel has ammeters, selector switches, or status lamps that must be retained, reconnect them only after verifying their compatibility with the new SP-3P control arrangement.
  • Update the panel schedule and equipment labels so maintenance personnel know the old starter has been removed and replaced by the SP-3P.

Guided Help Center

Step 1 / 4
9:41
1

Identify the complete old three-phase DOL starter assembly and isolate it from the panel.

Step 1 / 4

Assembly Mounting

SP-3P-9 and SP-3P-18 mount on a 35 mm DIN rail. SP-3P-32 mounts on the enclosure back plate using the supplied bracket. All models require ventilation clearance around the contactor.

Visual reference coming soon

Steps

  • With mains isolated and proved dead, mount the SP-3P assembly on the DIN rail (SP-3P-9/18) or bolt to the back plate (SP-3P-32).
  • Leave at least 30 mm clearance above and below the assembly for heat dissipation — three-phase contactors generate more heat than single-phase units at full load.
  • Mount the 12V DC DIN rail power supply adjacent to the SP-3P assembly.
  • Plan the cable routes before wiring: R/S/T input cables from the MCB/switch-disconnector; U/V/W motor cable to the motor terminal box; RS485 cable to the gateway in a separate low-voltage duct.

Guided Help Center

Step 1 / 4
9:41
1

Select DIN rail or back-plate mounting based on the SP-3P model size.

Step 1 / 4

Mains & Motor Wiring

Connect the three-phase supply to R, S, T input terminals and the motor to U, V, W output terminals on the SP-3P assembly. Cable size must match the motor FLA — use the minimum sizes specified below, or as required by the local wiring installation standard.

Visual reference coming soon

Steps

  • Connect phase R from the MCB/switch-disconnector to SP-3P terminal R.
  • Connect phase S to SP-3P terminal S.
  • Connect phase T to SP-3P terminal T.
  • Connect motor terminal U to SP-3P output terminal U.
  • Connect motor terminal V to SP-3P output terminal V.
  • Connect motor terminal W to SP-3P output terminal W.
  • Connect the motor earth (PE) to the enclosure earth bar — do not connect earth through the SP-3P assembly.
  • Set the overload relay FLA dial on the SP-3P front panel to the motor nameplate current (FLA). The dial is on the overload relay section of the assembly.
  • Connect 12V DC V+ and V− to the MX-3P control terminals inside the SP-3P assembly.
  • Connect RS485 cable: A core → MX-3P RS485-A; B core → RS485-B. Shield to earth at panel end only.

Guided Help Center

Step 1 / 4
9:41
1

Terminate the three incoming supply phases at R, S, and T on the SP-3P.

Step 1 / 4

Commissioning & First Start

Steps

  • Restore 12V DC power first — confirm the MX-3P LED illuminates (green or flashing blue).
  • Restore three-phase mains supply to the panel.
  • Complete Gateway Linking before issuing the first start command — see the Gateway Linking guide.
  • From the app, tap Manual Control → Start. The SP-3P contactor should click and the motor should start.
  • Measure motor running current on all three phases (R, S, T) using a clamp meter — confirm balanced current within 5% and within ±10% of the nameplate FLA.
  • If the motor runs in the wrong direction: isolate mains, then swap any two of the motor terminal connections at the motor terminal box (e.g., swap U and V). Do NOT swap supply phases at R/S/T.
  • Check phase-loss detection: temporarily remove one phase sense wire and confirm the app reports a phase-loss alarm within 2–5 seconds. Reconnect and reset.